![](/images/new-backgrounds/1169657/16965783x1.webp)
■Ending
End projection in accordance with the following procedure.
1 Switch off the power supply to the connected equipment. 2 Press the [Power] button.
A message to confirm that the power needs to be switched off will be displayed.
| Power |
| Help |
Power | Source | Keystone | |
|
| ||
| Enter | S | elect |
|
|
Power
Freeze
Power A/V Mute
R/C ON
| 3 |
2 | 4 |
1 | 5 |
| Enter |
Esc
3 Press the [Power] button once more.
The lamp will be extinguished, the Operation Indicator will blink in orange, and the cool- down process will commence.
Power OFF?
Please press
Power Key again to power off.
| Power | Help |
|
| K |
Power | Source | eystone |
| ||
| Enter | Select |
Power
Freeze
Power A/V Mute
R/C ON
| 3 |
2 | 4 |
1 | 5 |
| Enter |
Esc
The Operation Indicator will change from blinking to being illuminated in orange once the
Point
·Press a different button if the power is not to be switched off. The message will be erased after seven seconds if no buttons are pressed (the power will remain on).
·Button operations are not possible when the Operation Indicator is blinking in orange. In this event, please wait until full illumination has been attained.