Replacing the Air Filter

Procedure

1

Turn off the projector power, wait for thecool-down period to end, and then disconnect the power cord.

The cool-down period lasts for about 25 seconds. The actual time varies depending on the external air temperature.

2

Put your finger into the recess, and

then pull straight out to remove the air

filter.

3

Install the new air filter.

Slide the cover in from the outside, and then push

it in until it clicks into place.

Dispose of used air filters properly in accordance with your local regulations.

Appendix

51