Equator 375 service manual Drilling and tapping of the process pipe

Models: 375

1 33
Download 33 pages 23.21 Kb
Page 20
Image 20
7.Drilling and tapping of the process pipe.

The Blowing Process of the System. the Filling Sta- tion and the Vacuum Pumo and Opening of the Sys- tem

7.Drilling and tapping of the process pipe.

8.Connect dry nitrogen and equalize the pressure in the system.

9.Open the valve on the tongs at the filter drier and the spherical valve (18).

10.Open the valve for the filling station (11).

11.Slowly open the valve for the vacuum pump (12) and blow the system, the filling station and the vacuum pump through.

12.The system can then be opened with capillary tube scissors.

18.

Page 20
Image 20
Equator 375 service manual Drilling and tapping of the process pipe