49

 

 

 

 

B2

MAINTENANCE SCHEDULE CHECKLIST

 

 

 

 

 

 

(PHOTOCOPY AND FILE IN MAINTENANCE RECORDS)

 

 

 

 

Type of service check:

qmonthly

q3 monthly

q6 monthly

qyearly

 

Humidifier Serial Number:___________________________

Date: ______________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step

 

 

 

 

Method

Pass

Fail

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Monthly

 

Check Temperature Probe

 

 

Refer Appendix B1.1

q

q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check Reusable Heater Wire

 

 

Refer Appendix B1.1

q

q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check Heater Wire Connections

 

 

Refer Appendix B1.1

q

q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check Power Cable

 

 

Refer Appendix B1.1

q

q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Perform Self-Test

 

 

Refer Appendix B1.1

q

q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Three Monthly

 

Perform Temperature Probe Test and Check

 

see § 4.3 and Appendix B

q

q

 

 

 

Temperature Probe

 

 

 

 

 

 

Annually

 

Performance Check

 

 

see § 6

q

q

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electrical Safety Checks - as required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Method

 

 

 

Pass

Fail

 

 

 

 

 

 

 

 

 

 

 

 

 

Earth resistance test

 

Measure the resistance from the earth pin on the mains plug to:

 

 

 

 

 

 

 

i The heaterplate.(0.2 Ω maximum) (To get a good contact on the

q

q

 

 

 

 

 

anodised heaterplate, clip under the front edge of it.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ii The earth stud on the base of the humidifier(0.2 Ω maximum).

q

q

 

Insulation resistance test

 

Use a 500V DC tester to measure the resistance from the phase pin

 

 

 

 

 

 

 

on the mains plug to:

 

 

 

 

 

 

 

 

 

 

i The heaterplate (10 M Ω minimum).

 

q

q

 

 

 

 

 

ii The earth stud on the base of the humidifier (10 M Ω minimum).

q

q

 

Earth Leakage test

 

 

Has to be measured using an electrical safety tester as per IEC601.

q

q

 

 

 

 

 

Measure earth leakage with the earth probe of the tester on the

 

 

 

 

 

 

 

heaterplate. Earth leakage current is measured at normal operating

 

 

 

 

 

 

 

voltage and frequency of supply.

 

 

 

 

 

 

 

 

Should be 0.5 mA maximum in no fault condition.

 

 

 

 

 

 

 

 

Signature:______________________

 

 

Ref. 185040646 MR730/720/700/480 Technical Manual ¯ Revision F ¯ Issued March 2001

Page 55
Image 55
Fisher & Paykel MR700, MR720, MR730, MR480 Photocopy and File in Maintenance Records, Electrical Safety Checks as required