
| Rack model | Preparation | 
4.2Rack model
ÊTerminate all applications and shut down the server correctly.
ÊIf your operating system has not switched off the server, press the on/off button.
ÊPull all power connectors out of the power outlets.
4.2.1Opening the server
| 1 | 
| 2 | 
Figure 6: Loosening the knurled screws
ÊLoosen the four knurled screws (1) and pull the server as far as possible out of the rack (2).
| 16 | Options Guide | 
