Conair 50, 25, 15, 100 specifications Tools for installation

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 30
Image 30
Tools for installation:

Positioning the Dr yer on the Floor; Mounting the Hopper on the Throat

Manual background WARNING: You are responsible for the structural integrity of this installation.

We recommend that you:

Use bolts no smaller than 3/8 in. (M 10) to mount the hopper on the throat of a processing machine.

Tools for installation:

9/16” wrench

Flathead screwdriver

Hoist

The hopper bolts to the throat of the processing machine, as pictured above. The dryer can be positioned on the floor near the processing machine.

3 - 8 l I n s t a l l a t i o n

Page 30
Image 30
Conair 50, 25, 15, 100 specifications Tools for installation