Conair 15, 25, 50, 100 specifications You are now ready to begin installation, t i o n

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 25
Image 25
5 You are now ready to begin installation.

Unpacking the Boxes ( c o n t i n u e d )

4 Take a moment to record serial numbers and electrical power specifications

in the blanks provided on the back of the the User Guide’s title page. The infor- mation will be helpful if you ever need service or parts.

5 You are now ready to begin installation.

 

Follow the preparation steps on the next page, then choose one of the four

 

mounting options:

 

Dryer and hopper on the processing machine throat using the optional

 

support frame (see page 3-6).

 

Dryer on the floor; hopper on the throat (see page 3-8).

 

Dryer and hopper on a mobile floor stand (MDC mounting, see

 

Appendix B).

 

Dryer on a floor stand; hopper on the throat (see Appendix B).

D e

 

3 s c r i p

 

t i o n

I n s t a l l a t i o n l 3 - 3

Page 25
Image 25
Conair 15, 25, 50, 100 specifications You are now ready to begin installation, t i o n