Conair 50, 25, 15, 100 specifications Checking for Proper Air Flow, Central, causing permanent damage

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 34
Image 34
Checking for Proper Air Flow

Checking for Proper Air Flow

This step is only needed on 50, 75, and 100 models if the phase detection option was not ordered with the dryer.

CAUTION: This step must be performed before the dryer’s air hoses are connected to the hopper. Performing this step after the air hoses are connected could cause damage to the dryer if the air flow direction is incorrect due to improper phase connection. Material from the hopper can be pulled into the process heater,

causing permanent damage.

1Turn on the main power to the dryer. Make sure the dryer’s disconnect dial is in the ON position. This powers up the control and the display lights will illu- minate.

2Set the drying temperature. Press Setpoint Adjust or buttons to set the temperature.

When configured as a central dryer, the drying temperature can not be set since there is no process heater in the system.

Central

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set Point

 

 

 

 

Actual

 

 

 

 

 

Shutdown Alarms

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A1

Process HighTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A2

Process Loop Break

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A3

Process Heater HighTemp.

1

ProcessTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A4

Regen. Heater HighTemp.

2

Regen.Temp.

 

 

Process Blower

Regen. Blower

Auto Start

 

 

 

 

 

A5

Carousel IndexToo Long

3

Return AirTemp.

 

 

 

Process Pressure

Regen. Pressure

Desiccant Indexing

 

 

 

 

 

A6

Carousel Index Failure

4

Auto Start

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A7

Return Air HighTemp.

5

LoadTime (MDC)

 

 

 

 

Process Heater

Regen. Heater

Set-Back Temp.

 

 

 

 

 

Passive Alarms

6

Activate SetbackTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

SetbackTemp.(Process)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P1 ProcessTemp. Deviation

8

Setback Load Rate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P3 Regen.Temp. Deviation

9

PM1 Dewpoint

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P5 Return Air HighTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 - 1 2 l I n s t a l l a t i o n

Page 34
Image 34
Conair 50, 25, 15, 100 specifications Checking for Proper Air Flow, Central, causing permanent damage