D Carousel Dryer - DC-1
U S E R G U I D E U G D 0 2 4 / 0 3 0
Models 15, 25, 50, 75, and 100 with DC-1Controls
Date Manual Number: UGD024/0304 Serial Numbers
1-1 I n t r o d u c t i o n
Table of Contents
2-1 D e s c r i p t i o n
3-1 I n s t a l l a t i o n
4-1 O p e r a t i o n
5-1 M a i n t e n a n c e
i i l Ta b l e o f C o n t e n t s
AA p p e n d i
6-1 Tr o u b l e s h o o t i n g
BA p p e n d
DIAGNOSTICS
DA p p e n d i
CA p p e n d i
EAppendix
FAppendix
Ta b l e o f C o n t e n t s l
v i l Ta b l e o f C o n t e n t s
I n t r o d u c t i o n
How the Guide is Organized
Purpose of the User Guide
Your Responsibility as a User
Using the D Series as a Central Dr yer
Central
1 I n t r o d u c t i o n
WARNING: Voltage hazard
AT T E N T I O N Read this so no one gets hurt
1 I n t r o d u c t i o n
How to Use the Lockout Device
1 - 6 l I n t r o d u c t i o n
S E C T I O N
D e s c r i p t i o n
W h a t i s t h e D c a r o u s e l d r y e r ?
2 D e s c r i p t i o n
Typical Applications
What is the D Carousel Dr yer?
machine throat using the optional
Dryer and hopper on the processing
Central
Typical Applications c o n t i n u e d
Central
2 D e s c r i p t i o n
The Regeneration Cycle
How It Works
The Cooling Cycle
Central
Central
PROCESS COOLING REGENERATION
How It Works c o n t i n u e d
Dimensions inches cm
Specifications: D Carousel
SPECIFICATION NOTES
DEHUMIDIFYING DRYERS
2 D e s c r i p t i o n
Specifications: D Carousel c o n t i n u e d
OPTIONAL HOPPERS AND MOUNTING BRACKET
MOUNTING PATTERNS
2 - 8 l D e s c r i p t i o n
3 I n s t a l l a t i o n
I n s t a l l a t i o n
Mounting Hardware
Unpacking the Boxes
t i o n
5 You are now ready to begin installation
Preparing for Installation
3 D e s c r i p t i o n
Preparing for Installation c o n t i n u e d
Tools for installation
3 D e s c r i p t i o n
1Lift the hopper, support frame, and discharge assembly onto the process- ing machine throat. Use a hoist to lift the support frame and hopper. Position the frame and discharge assembly so that its bolt holes line up with the holes drilled in the throat. If hole patterns do not match, you can place a mounting adapter between the throat and the support frame
Tools for installation
Mounting the Hopper
Positioning the Dr yer on the Floor
3 D e s c r i p t i o n
Connecting the Main Power
Connecting the Main Power c o n t i n u e d
3 D e s c r i p t i o n
I n s t a l l a t i o n l 3 - 1
Checking for Proper Air Flow
causing permanent damage
Central
Press the STOP button
Checking for Proper Air Flow c o n t i n u e d
Return
Return Air Inlet
INSTALLATION NOTE: Models 50, 75, and
Checking for Proper Air Flow c o n t i n u e d
3 - 1 4 l I n s t a l l a t i o n
Connecting the Water Hoses
Connecting the Air Hoses
Secure hoses with clamps
3 D e s c r i p t i o n
Connecting the Optional Setback RTD
Connecting the RTD Probe
Central
Process RTD
Mounting a Loader on the Hopper
Testing The Installation
Central
3 D e s c r i p t i o n
Central
Testing The Installation continued
4Press the START button
5Press the STOP button
O p e r a t i o n
Central
The DC - 1 Dr yer Control Panel
D Dr yer DC - 1 Control Functions
Control Function Flow Chart
4 O p e r a t i o n
in the field
Central
Alarm
Central
Test Mode
S c r e e n
Control Function Descriptions
F u n c t i o n
1 CNTDRY
S c r e e n
Control Function Descriptions c o n t i n u e d
F u n c t i o n
Central
7 145
6 150
Control Function Descriptions c o n t i n u e d
S c r e e n
F u n c t i o n
9 -30
Control Function Descriptions c o n t i n u e d
S c r e e n
C 425 C04
C 400 C02
Control Function Descriptions c o n t i n u e d
S c r e e n
Control Function Descriptions c o n t i n u e d
C tim C07
S c r e e n
F u n c t i o n
S c r e e n
Control Function Descriptions c o n t i n u e d
F u n c t i o n
Central
Control Function Descriptions c o n t i n u e d
H off
S c r e e n
F u n c t i o n
S c r e e n
Control Function Descriptions c o n t i n u e d
F u n c t i o n
H off
S c r e e n
Control Function Descriptions c o n t i n u e d
F u n c t i o n
H off
S c r e e n
Control Function Descriptions c o n t i n u e d
F u n c t i o n
H off
Control Function Descriptions c o n t i n u e d
S c r e e n
F u n c t i o n
To Start Dr ying
Central
4 O p e r a t i o n
To Stop Dr ying
To Start Dr ying continued
Central
4 Press the START button
Using the Auto Start Countdown Function
Auto Start
4 O p e r a t i o n
0 754
Setting the High Setpoint Limits
C 400 C02
0 754
5 M a i n t e n a n c e
M a i n t e n a n c e
•Whenever you change materials
Preventative Maintenance Checklist
•Weekly, or as often as needed
•Monthly
5 M a i n t e n a n c e
Cleaning the Hopper
Cleaning the Regeneration Filter
Cleaning the Process Filter
Cleaning the Precooler Coils
Cleaning the Aftercooler Coils
Inspecting Hoses and Gaskets
2Tighten any loose hose clamps or fittings
5 - 6 l M a i n t e n a n c e
Tr o u b l e s h o o t i n g
2Address the alarm message and fix the problem
Before Beginning
Diagnose causes from the control panel
Diagnose causes from the front of the dryer
A Few Words of Caution
How to Identify the Cause of a Problem
Problem
Shut Down Alarms
Solution
Possible cause
Shut Down Alarms
Possible cause
Problem
Solution
Shut Down Alarms
Solution
Problem
Possible cause
Problem
Shut Down Alarms
Solution
Possible cause
Problem
Shut Down Alarms
Solution
Possible cause
Problem
Passive Alarms
Solution
Possible cause
Problem
Passive Alarms
Solution
P6 Regen High Temperature
Problem
Passive Alarms
Solution
Possible cause
Possible cause Solution
Passive Alarms
Problem
Problem
Passive Alarms
Solution
Possible cause
S e t b a c k
Central
Screen
To set-upsetback on the load rate option
Fuse Blocks
Replacing Fuses
Troubleshooting
Tr o u b l e s h o o t i n g l 6 - 1
Checking Heater Solid State Relays
Checking or Replacing Temperature Sensors
A d j u s t i n g t h e L i m i t S w i t c h
Regeneration Heater
Replacing the Heaters
Replacing the Heaters
2.5 63.5mm
Regeneration Heater c o n t i n u e d
For D15, D25, and D50 Dryers
Replacing the Heater
Process Heater
Central
Replacing the Heater
For D75 and D100 Dryers
Central
Process Heater
2 Remove the right side panel from the dryer
Troubleshooting
Refilling the Desiccant Tanks
Troubleshooting
Refilling the Desiccant Tank c o n t i n u e d
6 - 2 8 l Tr o u b l e s h o o t i n g
We’re Here to Help
How to Contact Customer Ser vice
Before You Call
From outside the United States, call:
Performance Warranty
Equipment Guarantee
Warranty Limitations
A - 2 l A p p e n d i
Tools for installation
Mounting the Dr yer on a Floor Stand
5/32” Allen wrench 3/8” and 9/16” wrench
Tools for installation
Phillips screwdriver Flathead screwdriver
Hoist and strap
2Bolt the hopper to the mobile floor stand. Using four 3/8”-16M 10 self-lockingbolts, fasten the hopper to the mobile floor stand
C - 1 l A p p e n d i
Installing an Aftercooler O p t i o n a l
Installing an Aftercooler O p t i o n a l
continued
A p p e n d i x l C -
1 Stop the dryer and lockout the main power
Cleaning the Aftercooler
3Remove the plastic aftercooler cover
continued
Cleaning the Aftercooler c o n t i n u e d
11Install the plastic aftercooler/precooler cover
Cleaning the Aftercooler c o n t i n u e d
1 Stop the dryer and lockout the main power
Installing the Flow Control O p t i o n a l
Installing a Precooler O p t i o n a l
Precooler installed on a D 15,
Installing a Precooler O p t i o n a l
installed on a D 15, 25, and 50 dryer
and 50 dryer without a flow control
1Stop the dryer and lockout the main power
Cleaning the Precooler
3Remove the plastic precooler cover
E - 3 l A p p e n d i
Cleaning the Precooler c o n t i n u e d
O p t i o n a l
Installing the Dew Point Sensor
Central
What is the MDC?
Typical Applications
Central
An aftercooler is required if
Central
How Conveying Works
Central
Specifications: MDC
Outlet - 2 in. dia. 5.1 cm
Inlet - 1.5 in. dia. 3.8 cm
SPECIFICATION NOTES
When config
Specifications MDC c o n t i n u e d
Central
When configured as
Unpacking the Boxes
Central
3Carefully inspect all components to make sure no damage occurred during shipping, and that you have all the necessary hardware
Central
Preparing for Installation
Central
1Make sure the location for the MDC provides
Installing the MDC
Tools for installation
Central
Central
Connecting Conveying Lines
1.5 in. diameter material conveying hose
Vertical conveying
Connecting the RTD Probe
Connecting the Demand Sensor
Connecting the Main Power
Connecting the Water Hoses
The MDC Control Panel
Testing the Installation
MDC Control Functions
Using the Auto Start Countdown Function
Central
To Start Conveying
To Stop Conveying
Transporting the MDC
Central
Cleaning the Conveying Lines
Preventative Maintenance Schedule
Cleaning the Hopper
See “Preventative Maintenance Checklist” page
Central
Cleaning the Vacuum Receiver
Clean the inside of the dust collector housing
Cleaning the Dust Collector
Central
Page 4-6,Screen
Cleaning the Process Filter
Inspect Hoses and Gaskets
Cleaning the Regeneration Filter
Cleaning the Aftercooler Coils