Conair 25, 15, 50, 100 Testing The Installation continued, Central, 4Press the START button

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 40
Image 40
Testing The Installation (continued)

Testing The Installation (continued)

4Press the START button.

If everything is installed correctly:

Start

The green light on the start button will illuminate.

The process and regeneration blowers turn on.

The process and regeneration heaters turn on.

The regeneration heater turns on.

Central

If the desiccant tanks are not in their correct position, the carousel will turn clockwise and stop in the correct position.

5Press the STOP button.

If everything is installed correctly:

Stop

The blowers will continue running as needed to cool the heaters.

6The test is over. If the dryer performed the normal operating sequences as out- lined, you can load the hopper and begin operation. If it did not, refer to the TROUBLESHOOTING section of the User Guide.

3 - 1 8 l I n s t a l l a t i o n

Page 40
Image 40
Conair 25, 15, 50, 100 Testing The Installation continued, Central, 4Press the START button, 5Press the STOP button