Conair 50, 25, 15, 100 specifications Preparing for Installation

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 26
Image 26
Preparing for Installation

Preparing for Installation

The D carousel dryer is easy to install if you plan the location and prepare the mounting area properly.

1Make sure the mounting area provides:

A grounded power source supplying the correct current for your dryer model. Check the dryer’s serial tag for the correct amps, voltage, phase, and cycles. Field wiring should be completed by qualified personnel to the planned location for the dryer. All electrical wiring should comply with your region’s electrical codes.

A source of water, if you have an aftercooler and / or precooler.

The D dryer’s optional aftercooler and precooler can use 1-2 gals./min. (3.8-

7.6liters/min.) tower, city, or chiller water at temperatures of 40° to 85°F (4° to 29°C). Pipe should be run to the planned dryer location. Use flexible hose to connect the water pipes to the aftercooler and precooler. If the dryer has an optional flow control, see Appendix D for connection information.

Minimum clearance for safe operation and maintenance.

You should maintain 24 in. (61 cm) clearance on at least three sides of the dryer. If the dryer is mounted with a hopper on a processing machine throat, clearance between the dryer and hopper can be 4 in. (10.2 cm).

Regeneration exhaust

Regeneration exhaust high temperature

6 in. (15.24 cm)

6 in. (15.24 cm)

needed to change

filter

3 in. (7.62 cm)

D-15, D-25 & D-100

Minimum

Clearance

3 - 4 l I n s t a l l a t i o n

high temperature

12 in. (30.48 cm) needed to remove optional aftercooler coil for cleaning

3 in. (7.62 cm)

6 in. (15.24 cm) needed to change filter

3 in. (7.62 cm)

6 in. (15.24 cm)

D-75 & D-100

Minimum

Clearance

12 in. (30.48 cm) needed to remove optional aftercooler coil for cleaning

3 in. (7.62 cm)

Page 26
Image 26
Conair 50, 25, 15, 100 specifications Preparing for Installation