Conair 15, 25, 50, 100 specifications To Start Dr ying, Central, O p e r a t i o n

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 57
Image 57
To Start Dr ying

To Start Dr ying

1Make sure there is material in the hopper.

2Turn on the main power to the dryer. Make sure the dryer’s disconnect dial is in the ON position. This powers up the con- trol and the display lights will illuminate.

3 Set the drying temperature. Use the Scroll button to get to the Process Temp function. Press the Adjust Setpoint or J￿buttons to select the temperature.

When configured as a central dryer, the drying temperature can not be set since there is no process heater in the system.

Central

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set Point

 

 

 

 

 

Actual

 

 

 

 

 

Shutdown Alarms

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A1

Process HighTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A2

Process Loop Break

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A3

Process Heater HighTemp.

1

ProcessTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A4

Regen. Heater HighTemp.

2

Regen.Temp.

 

 

 

Process Blower

Regen. Blower

Auto Start

 

 

 

 

 

A5

Carousel IndexToo Long

3

Return AirTemp.

 

 

 

 

Process Pressure

Regen. Pressure

Desiccant Indexing

 

 

 

 

 

A6

Carousel Index Failure

4

Auto Start

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A7

Return Air HighTemp.

5

LoadTime (MDC)

 

 

 

 

 

Process Heater

Regen. Heater

Set-Back Temp.

 

 

 

 

 

Passive Alarms

6

Activate SetbackTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

SetbackTemp.(Process)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P1 ProcessTemp. Deviation

8

Setback Load Rate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P3 Regen.Temp. Deviation

9

PM1 Dewpoint

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P5 Return Air HighTemp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(continued)

4 O p e r a t i o n

O p e r a t i o n l 4 - 1 7

Page 57
Image 57
Conair 15, 25, 50, 100 specifications To Start Dr ying, Central, O p e r a t i o n