1Move the MDC to the processing machine. Lock the wheels and connect the main power source. Connect the water source if you have an aftercooler.

2Mount the vacuum receiver on the feed throat. Push the vacuum receiver onto the mounting bracket.

2

3

Central

When configured as a central dryer, the MDC option is not available.

3Place the appropriate material insert inside the distribution box.

4Make sure all hoses are connected securely.

1” opening

Virgin material insert

1.25” opening

Regrind material insert

5Adjust the demand sensor. Position the sensor at the lowest

level of material that you want to maintain in the viewing chamber before another load cycle begins. Make sure the sensor rests against the sight glass.

6Set the load time. Once the load time is set above zero, conveying will start. See page 4-6, Screen 9