Conair 50, 25 Preparing for Installation, Central, 1Make sure the location for the MDC provides

Models: 15 100 25

1 128
Download 128 pages 56.24 Kb
Page 118
Image 118
1Make sure the location for the MDC provides:

Central

When configured as a central dryer, the MDC option is not available.

Preparing for Installation

The MDC has been designed for use beside the processing machine. The mobile unit also can be used for pre-drying in a remote location.

1Make sure the location for the MDC provides:

A grounded power source supplying the correct current for your dryer model. Check the dryer’s serial tag for the correct amps, voltage, phase and cycles. Field wiring should be completed by qualified personnel to the planned location for the dryer. All electrical wiring should comply with your region’s electrical codes.

A source of water, if you have an aftercooler. The dryer’s optional aftercooler can use tower or city water at temperatures of 40° to 85°F (4° to 29°C). Pipe should be run to the planned dryer location. Use flexible hose to connect the water pipes to the aftercooler.

Minimum clearance for safe operation and maintenance. The MDC should not be placed near flammable or combustible materials during operation. We recommend at least 25 inches (63.5 cm) clearance above the dryer for removing the carousel housing. You will need at least 24 inches (61 cm) clearance on any side of the MDC for access to components that need cleaning or servicing.

2Mount the vacuum receiver mounting bracket. Lay out the bolt pattern of the processing machine feed throat on the blank base plate of the vacuum receiver mounting bracket and gasket. Drill holes for the mounting bolts you plan to use. Place the gasket between the feed throat and mounting bracket. Bolt the mounting bracket to the feed throat.

NOTE: You will receive a 4”x4” or 6”x6” mounting

bracket, as specified in your order. If you need a larger mounting bracket, call your Conair sales representative.

Drill mounting bolt holes

Manual background Mounting bracket

Gasket

6 in.

6 in.

4 in.

4 in.

G - 8 l A p p e n d i x

Page 118
Image 118
Conair 50, 25, 15, 100 specifications Preparing for Installation, Central, 1Make sure the location for the MDC provides