4.In the order shown in the figure below, pass the gland nut, flat washers (3 pcs.) and gasket onto the power cable.

5.As shown in the figure below, fold back armor onto flat washer and insert it thru the other flat washer. Cut off part of armor that protrudes past flat washer..

Flat washer

(1) (2) (3)

Power cable

Gland nut

Cut off armor that

 

protrudes past washer.

 

Gasket

Passing flat washer, etc. onto HV cable

6.Pass the power cable though its cable gland and then tighten the gland nut..

7.Pass the power cable to the rear of the antenna unit.

Terminal for power cable

Cable gland for power cable (TPYCY-2.5)

Antenna unit, left-side view

8.Connect the power cable to its terminal, referring to the interconnection diagram.

9.Close the cover.

10.Seal the cable gland for the power cable with putty.