Magnum 6K25 Managed Fiber Switch

Installation and User Guide (04/06)

NOTE: All 6KPM slots need not be filled in order for the Magnum 6k25 unit to be operational. When leaving 6KPM slots empty, always use a face plate (Magnum 6K8- BLNK) to cover the slot opening in the front panel. This will maintain proper cooling air flow, safety, and operation as required by FCC, CE, and other regulations.

Step 6. Now screw down the daughter board with 6 #440 screws, so that it holds the daughter board securely. The figure below shows the top view of 6KPM card after successfully installing the 6KPM cards inside the Magnum 6K25.

Fig. 3.5.2g Top View : 6KPM Module installed inside a 6K25

Step 7. Once the installation of granddaughter and daughter modules is done, the front panel screen plates need to be placed on the front of the chassis cover to complete the installation process for that port module. The front panel screen plate comes along with the package of port module separately along with brackets and 6 #256 flat head screws. The brackets and screws have been

installed inside of the top cover as shown in Fig. 3.5.2h.

Fig. 3.5.2h Inside view of chassis cover (from the rear), showing the front panel screen plates installed inside the chassis cover using brackets and screws

Step 8. Once all 6KPM cards have been installed (including faceplates for empty slots), the chassis cover should be replaced. Make sure the chassis cover is aligned properly before securing the enclosure.

www . GarrettCom . com

32

Page 39
Image 39
GarrettCom manual 2g Top View 6KPM Module installed inside a 6K25