Magnum 6K25 Managed Fiber Switch | Installation and User Guide (04/06) |
user may elect to Ground either + or = terminal to suit the customer’s use.
Before connecting hot lines to the Terminal Block of
The connection procedure is straightforward. Simply connect the DC leads to the Switch’s power terminals, positive (+) and negative
The 24VDC & 125VDC terminal block on Magnum 6K25’s is similar to that described in the
C5.1 UL Requirements
The following must be adhered to in order to conform to UL requirements:
1.Minimum 18 AWG cable for connection to a Centralized DC power source.
2.Minimum 14 AWG cable for connection to earthing wiring.
3.Use only with Listed 10 A circuit breaker provided in building installation.
4.“Complies with FDA radiation performance standards, 21 CFR subchapter J.” or equivalent.
5.Fastening torque of the lugs on the terminal block: 9 inch pound max.
6.Centralized DC Power Source cable securement, use at least four cable ties to secure the cable to the rack at least 4 inches apart with the first one located within 6 inches of the terminal block.
C6.0 ORDERING INFORMATION
To order the optional
Example: Magnum 6K25R-48VDC
Similarly, order the “Dual
Example: Magnum 6K25R-24VDC or Magnum 6K25R-125VDC
Or
C7.0 OPERATION
Operation of the
www . GarrettCom . com
60