Magnum 6K25 Managed Fiber Switch | Installation and User Guide (04/06) |
550m at full duplex.
The GBIC transceiver is fastened using
Each port has an Activity (ACT) LED indicating packets being received and a Link (LK) LED indicating proper connectivity with the remote device when lit.
5.2.13a
The Magnum
Each port has an Activity (ACT) LED indicating packets being received and a link (LK) LED indicating proper connectivity with the remote device when lit.
5.2.146KM-BLNK
The
any empty 6K25 PM slot to maintain proper cooling air flow, safety, etc.
Two screws underneath the front panel hold the
6.0TROUBLESHOOTING
All Magnum Ethernet products are designed to provide reliability and consistently high performance in all network environments. The installation of a Magnum 6K25 Switch is a straightforward procedure (see INSTALLATION, Section 2.6); the operation is also straightforward and is discussed in Section 4.
Should problems develop during installation or operation, this section is intended to help locate, identify and correct these types of problems. Please follow the suggestions listed below prior to contacting your supplier. However, if you are unsure of
www . GarrettCom . com
52