Connect the flex cable and the 2×3 cable to the backplane.
Lift the power supply out of the case.

6 Lift the front edge of the power supply, then pull it toward the front of the server to disengage it from the retention clips at the back of the server.

7

8 Place the replacement power supply into the chassis, then slide it towards the back of the server to engage it beneath the two retention clips at the back of the chassis.

9 Connect the power signal cable, the main power cable, and the CPU power cable to the system board.

10

11 If you have a hot-swap backplane installed, follow the instructions in “Installing the air baffle” on page 44.

12 Follow the instructions in “Closing the server case” on page 39.