F-36 PRO Laminator Operation Manual

Installation

 

 

  !  

Before an F-36 PRO Laminator can be installed there are a few requirements that must be met. Make certain that each of the requirements listed in the following preinstallation checklist are met before beginning installation.

CAUTION

Failure to follow the preinstallation checklist can

result in damage to the laminator.

   # +

Are doorways and hallways wide enough for the laminator to be moved to the installation site?

Is there ample room for the laminator?

A work area must be established that allows for operation in both the front and the rear of the machine and provides space for efficient material flow. Figure 2-1 shows a typical machine area lay- out.

Is the environment appropriate for the laminator? The laminator requires a clean, dust and vapor free environment to operate properly, such as an air conditioned office area with forced 10% make up air. However, the laminator must not be located where there is air blowing directly on it. Major fluctuations in temperature and humidity are to be avoided.

WARNING

The operating environment must be free of dust,

flammable liquids and vapors. You can be injured by inhaling chemical vapors. Vapor build up or stored flammable liquids can cause a fire. Excessive dust can damage the laminator.

CAUTION

Do not locate the laminator where air is blowing directly on the machine. The air flow can cool the rolls unevenly and result in poor quality output.

Is there an appropriate power source available and has a certified electrician been contacted to wire the laminator directly?

The laminator requires 30A single phase service and a power receptacle that accepts a 30A 250V NEMA L6-30P plug or, in Europe, 3 phase, 240/ 400 VAC with 20A per phase. See Figure 2-6 for power cord connection options.

CAUTION

Position the jumpers as shown in Figure 2-6 for

service choice.