3.8.2Power connection with common input utility
PE Load | PE |
| Input rectifier |
D |
| L1 |
|
|
A |
|
|
|
|
O | L2 |
|
|
|
L |
|
|
| |
|
|
|
| |
L3 |
|
|
|
|
N |
|
|
|
|
|
|
|
| |
|
| R | ||
|
|
|
| IE |
|
|
|
| IF |
|
|
| T | |
|
| C |
| |
| E |
| ||
|
| R |
|
|
|
| T |
|
|
|
| U |
|
|
N | P |
|
| |
IN |
|
|
| |
| - |
|
|
|
| 1 |
|
|
|
PE Load
Position of the PE compression lugs in case | PE | |
Input rectifier | ||
the cable input is from the bottom of the UPS |
Fig.
Common Input Rectifier / Bypass
Rectifier + Bypass Phase A |
|
| |
Rectifier + Bypass Phase B |
|
| |
Rectifier + Bypass Phase C |
|
| |
N | Neutral (Bypass) | PE | Ground |
Output Load
L1 | Load Phase A | L2 | Load Phase B | L3 Load Phase C |
N | Neutral | PE | Ground |
|
Bus bars BR1, BR2 and BR3 must remain connected.
Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above. Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for input/output and DC power connections on Bus Bars: Section 3.8.1.
OPM_SGS_ISG_M22_M30_0US_V011.doc | 23/38 | Installation Guide SG Series 225 & 300 kVA |