3.5VENTILATION AND COOLING

Fig. 3.5-1 Installation on plain floor

Fig. 3.5-2 Installation on raised floor

 

 

The heat produced by the UPS is transferred to the environment by its ventilation.

Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top of the cabinet.

A suitable ventilation or cooling system must be installed to extract the heat from the UPS room.

Do not put anything on the top of the cabinet.

Air filtration systems could be required when the UPS operates in a dirty environment. Contact your Dealer or the nearest Service Center for appropriate solutions.

In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air exhaust flow rate requirement of the UPS system.

The below table indicates the heat dissipation at full Load at PF = 0.8 lag. and charged Battery, up to 3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C).

 

UPS rating

 

 

Losses

 

Cooling air flow

 

 

BTU / hr

 

 

kW

 

CFM

 

m3 / h

 

 

 

 

 

 

 

 

SG Series 225 kVA

 

50,512

 

14.80

2,541

4,317

 

 

 

 

 

 

 

 

 

SG Series 300 kVA

 

64,164

 

18.80

3,228

5,484

 

 

 

 

 

 

 

 

 

 

 