WALL CASE WITH RAD10 DRAIN KIT

EXTERNAL DRAIN

SEE PAGE 36 FOR INTERNAL DRAIN

SCREWS

“A” “B”

METAL PLASTIC

SEE PAGE 36 NOTE #6

SQUARE DRAIN HOLES

1/2" O.D. 90° ELBOW DRAIN TUBE

NEOPRENE SPONGE GASKET

STEEL MOUNTING PLATE

USE TYPE “A” SCREW FOR METAL CASE (RAB71)

AND TYPE “B” SCREW FOR MOLDED CASE (RAB77)

WATER DRAINAGE - Precipitation entering the unit through the outdoor louver may not be removed entirely by the condensate removal system. The base pan flange is designed to allow excess water, either condensate water or precipitation, to flow into the wall case and drain through two drain holes in the rear of the wall case. If there is more water in the wall case than can be drained through these holes it will drain through the three overflow drain holes. These drain holes must not be blocked when mounting or caulking the wall case.

Caulk around perimeter of wall case all four sides where it joins the building.

REAR

GRILLE

NOTE: SHADED PARTS AND

 

SCREWS ARE INCLUDED

 

WITH RAD10 DRAIN KIT.

Alternate

USE EITHER THE 90°

6" long, 1/2"

ELBOW TUBE OR THE

O.D. straight

STRAIGHT TUBE

copper tube.

DEPENDING UPON THE

 

REQUIREMENTS OF THE

 

PARTICULAR

 

INSTALLATION.

TYPICAL INSTALLATION

CASE ANGLES (FIELD SUPPLIED)

WALL CASE

ROOM

CABINET

35

For those installations where water draining from the drain holes is objectionable or where positive drainage is desired, the RAD10 drain kit is available with either a 90° elbow or a 6” straight tube to be used either to connect to a field supplied drain line or to allow the water to drip free rather than drain down the surface of the building.

NOTE: Drain kit using either the 90° elbow tube or the straight tube may be installed without modification when using RAG60 exterior grille. Drain kit using the 90° elbow tube may be installed without modification when using RAG61 through RAG66 exterior grilles. Modification must be made to the RAG61 through RAG66 exterior grilles when using the straight tube. Modification must be made to the RAG67 grille if using either the 90° elbow tube or the straight tube (see installation instructions with the RAG67 grille).

90° ELBOW DRAIN TUBE

PROJECTION 3"

BEYOND WALL 4" CASE

MIN. 2 SUPPORTS

FLOOR

FIELD SUPPLIED

 

Page 35
Image 35
GE 5500 manual Wall Case with RAD10 Drain KIT, Rear Grille, Typical Installation, Wall Case Room Cabinet, MIN Supports

5500 specifications

The GE 5500 is a sophisticated gas turbine that represents a benchmark in the realm of power generation technology. Known for its impressive performance and efficiency, the GE 5500 has garnered attention in various industries, particularly in energy production. Designed for combined-cycle applications, this turbine effectively leverages both gas and steam cycles to optimize electricity generation.

One of the standout features of the GE 5500 is its advanced aerodynamics, which enhance the efficiency of the combustion process. The turbine employs state-of-the-art combustion technology that allows for high operational flexibility and minimizes emissions, meeting stringent environmental standards. This is particularly important in today’s energy landscape, where sustainability is a crucial focus.

The GE 5500 is equipped with a robust control system that utilizes digital twin technology. This innovative approach allows operators to simulate and analyze the performance of the turbine virtually, leading to improved operational efficiency and reduced downtime. Additionally, this turbine features an integrated health monitoring system that provides real-time data on performance metrics, allowing for predictive maintenance and enhancing overall reliability.

The materials used in the construction of the GE 5500 are engineered to withstand high temperatures and stress levels, ensuring longevity and durability. This includes high-performance alloys that maintain structural integrity even under extreme operating conditions.

Installation and maintenance of the GE 5500 are streamlined through its modular design, which simplifies access to components and reduces service time. This efficiency translates into lower operational costs, making the GE 5500 an economically favorable choice for utilities and independent power producers.

Furthermore, the GE 5500 can be integrated into a variety of power plant configurations, whether for peaking power or baseload operations, which adds to its versatility. Its ability to quickly ramp up production makes it particularly valuable in an energy market characterized by fluctuating demand.

Overall, the GE 5500 gas turbine is a remarkable engineering feat that combines cutting-edge technology with practical design. Its efficiency, reliability, and adaptability position it as a leading choice for power generation needs, meeting the requirements of modern energy systems while contributing to a more sustainable future.