Rev. May 2001

GraviMaster-FGB-M05 (S)

Page 13

 

Gravimetric Blender

 

2.7.6Dispensing

Dispensing of the different components will start after the calculation of the related weights. The components are dispensed in the order as defined in the recipe (gravimetric only). In volumetric mode all components are dispensed at the same time.

Every mechanical valve has a reaction time. The controller uses the ‘Hardware Reaction Time’ to calculate the time which the dispense valve must be activated. The ‘Hardware Reaction Time’ is the maximum active time of the valve when no material is dispensed. The controller uses a pulse of 5ms in the following algorithm:

OpenTime = Weight [g] / dipenseSpeed [g/s]

OpenPulses = (OpenTime [s] / 0.005 [s]) + HardwareReactionTime [Puls]

After every dispense cycle the weight is measured. The weight bin must be stable before the weight can be measured, therefore a time delay is inserted between dispense and measuring. When the controller starts measuring the signal must be stable for at least 1 sec. (signal within the ‘Weighbin-variationband’)

After measuring the weight of the first dispense some calculations can be done, and with the results parameters can be changed. Result is a more accurate next dispense. After the first dispense of a material one of the following situation occurs:

Dispense is correct

The difference between calculated- and measured weight is less then the dispense accuracy. In this case extra dispense tries of this material are not necessary.

Dispense not correct (too little)

The difference between calculated- and measured weight is more than the dispense accuracy but there is less dispensed (measured) than calculated. In this case the controller reacts according to the chosen ‘alarm-type’. The following ‘alarm-types’ are possible:

IGNORE No extra dispense-tries. Relations within the recipe will corrected by re-calculations.

WARNING The controller tries to reach the dispense-accuracy by extra dispenses. The extra dispenses are limited by the parameter ‘dispenseTry’. When after a maximum number of dispense tries, the accuracy is not reached the controller sends a warning only to the user (= The controller continues with the next material).

ERROR The reaction of the controller is equal to ‘WARNING’ only an error is sent to the user when the accuracy is not reached. Now the controller waits for a confirmation (enter) to initiate new dispense tries of the same material. This process goes on until the dispense accuracy is reached.

Page 14
Image 14
GE FGB-M05 manual Dispensing, Dispense is correct, Dispense not correct too little

FGB-M05 specifications

The GE FGB-M05 is a cutting-edge gas turbine designed for a variety of industrial applications, showcasing remarkable efficiency and advanced technology. As a part of General Electric's extensive portfolio of power generation solutions, the FGB-M05 stands out for its versatility and reliability.

One of the main features of the FGB-M05 is its modular design, which allows for easy maintenance and adaptability to different operating conditions. This modularity helps reduce downtime and enhances overall operational efficiency. The gas turbine is engineered to optimize performance across a wide range of workloads, making it suitable for both base load and peak shaving applications.

Incorporating advanced aerodynamics, the FGB-M05 leverages high-efficiency compressor stages that significantly improve its operational performance. The turbine features state-of-the-art cooling technologies that enhance combustion efficiency while ensuring longer equipment life. This is particularly important in high-temperature applications, where maintaining material integrity is crucial.

The FGB-M05 is equipped with sophisticated control systems that enable real-time monitoring and optimization of its operational parameters. These control systems enhance the turbine’s capability to respond dynamically to changing load demands, ensuring that it operates at peak efficiency at all times. Additionally, the turbine supports a range of fuels, including natural gas and biogas, making it a versatile choice for various power generation needs.

Furthermore, the FGB-M05 incorporates advanced emissions control technologies, reducing its environmental impact. It is designed to meet stringent emissions regulations, boasting low NOx and CO emissions levels, which are essential for compliance in many regions.

The GE FGB-M05 gas turbine is also noted for its compact footprint, making it an ideal solution for locations where space is limited. Its combination of high performance, flexibility, and reduced emissions makes it a preferred choice for energy providers looking to invest in sustainable and efficient power generation technologies.

In summary, the GE FGB-M05 gas turbine stands as a testament to modern engineering, combining innovative features, robust technology, and a commitment to environmental responsibility. Whether for industrial applications, peaking plants, or renewable integration, the FGB-M05 delivers reliability and excellence in performance.