GE JGP989 manual Preparation, Installation Instructions, For rigid connection

Models: JGP989

1 72
Download 72 pages 53.05 Kb
Page 17
Image 17
PREPARATION

Installation Instructions

PREPARATION

TOOLS AND MATERIALS

YOU WILL NEED

Saw

Duct tape

Measuring tape or scale

Carpenter’s square

Adjustable wrench or socket set (7/16socket and ratchet)

Drill and drill bit

1/4nut driver

Sheet metal screws

Pipe wrench

Manual gas line shut-off valve

Pipe joint sealant that resists action of LP gas

Ductwork to suit the installation

For rigid connection:

Shut-off valve

Union

Pipe fittings as required

For flexible connection where local codes permit:

Flexible metal tubing (same 3/4or 1/2I.D. as gas supply line)

30COOKTOP (DIMENSIONS FOR REFERENCE ONLY)

Unit shown fully assembled.

For rigid connection: 2178For flexible connection where local codes permit:

22

2978

6

Unit shown fully assembled.2012Unit must be vented to the outside!

2834

Unit must be vented to the outside!

17

Page 17
Image 17
GE JGP989 Preparation, Installation Instructions, For rigid connection, For flexible connection where local codes permit