Installation Instructions
INSTALLING THE COOKTOP
13ATTACHING A BLOWER TRANSITION DUCT
Use a blower transition duct for all downward duct installations to connect to 6″ round standard ductwork. This 31⁄4″ x 10″ rectangle to 6″ round transition duct is available at your local building supply store.
Screw
(on other
side)
Screws
Install the transition duct to the blower outlet. Secure all joints with duct tape to assure an airtight seal.
14CONNECTING THE DUCTWORK
Connect the ductwork prepared in Steps 5 and 6 to the blower transition duct.
27