GE JGP989 manual Ductwork Installation, Installation Instructions, 6INSTALLING THE DUCTWORK

Models: JGP989

1 72
Download 72 pages 53.05 Kb
Page 22
Image 22
DUCTWORK INSTALLATION

Installation Instructions

DUCTWORK INSTALLATION

(Note: For planning purposes only.)

6INSTALLING THE DUCTWORK

Use galvanized or aluminum duct in 6round or 314x 10size, or a combination of both.

PVC duct should be used if installing under a poured concrete slab.

NOTE: Local building code must be followed in specifying approved type and schedule of ALL duct used.

Always use an appropriate roof or wall cap with damper. Laundry-type wall caps should NEVER be used.

Through Cabinet Toe Space

 

Between Floor Joist

Downward Venting

Install ductwork, making male-female connections in the direction of airflow as shown. Secure all joints with sheet metal screws and duct tape to assure an airtight seal.

Duct Tape Over Seam

and Screw

Air Flow

Screw

Use the shortest and straightest duct run possible. For satisfactory performance the duct run should not exceed 100 feet equivalent length. Refer to TABLE 1 of equivalent lengths. Use TABLE 1 to calculate the total equivalent length of the ductwork.

OPTIONAL INSTALLATION:

REAR WALL VENTING

5round duct may be used on SHORT DUCT runs of 3 feet or less, such as direct to outside wall venting.

Inside Wall to Roof Direct to Outside

Rear Wall Venting

To convert blower exhaust direction, remove four nuts behind the filter which hold blower and wire finger guard.

Rotate blower and reinstall to vent chamber, as shown above. Retighten nuts, but do not overtighten.

22

Page 22
Image 22
GE JGP989 Ductwork Installation, Installation Instructions, 6INSTALLING THE DUCTWORK, Note For planning purposes only