Installation Preparation
PARTS PROVIDED
Locate the parts packed with the hood.
Allen Wrench
Transition with Damper
Implement rods with standoffs
| Duct collar |
2 Grease trays (3 with 54" hood) | 2 Filters (3 with 54" hood) |
Support frame for 8 ft. ceiling with 4 large pan head screws installed on the bottom corners.
Decorative top cover
HARDWARE PACKAGE
Locate and check contents. Screws shown actual size.
Screws A 4 (7/16") hex head wood screws
Screws B
2 (1/8" x
pan head screws.
| Screws D |
| 2 small |
| Phillips |
2 Templates | head |
| screws |
Screws C 8 blunt point Phillips screws
ACCESSORY PACKAGE
Check accessory package.
Select the taller set for 9’6" to 10’4" ceilings. Select the shorter set for 8’6" to 9’6" ceilings. Discard unused set.
2 Sets of Duct Covers
2 Support Frames with 8 height adjustment screws
4 Attachment Screws
Screw F
Screws E
2 Phillips
Blower safety screw and lock washer,
Phillips head M 6 x 16.
head wood screws
Note: Hardware appearance may vary slightly.
9