GE ZV541, ZV421 Installation Preparation, Tools And Materials Required, Remove The Packaging

Models: ZV421 ZV541

1 20
Download 20 pages 1.99 Kb
Page 8
Image 8
Installation Preparation

Installation Preparation

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

 

7/16" Pivoting

 

hex socket with 4"

 

 

 

 

and 6" extensions

 

Duct tape

Wire cutter/stripper

 

 

Pencil and tape measure

 

 

 

 

Safety glasses

Spirit level

 

Wire nuts

 

 

 

 

Flashlight

Hammer

Electric or battery operated drill

Key Hole Sawand 3/16", bits, Phillips and Flat Blade Screwdriver bits.

10" round metal duct, length to suit installation.

Phillips and flat blade screwdrivers

Saber saw

Strain relief for

or Sawsall

junction cover.

 

Step ladder

120V 60Hz. 15 or 20 Amp, 2-wire with ground. Properly grounded branch circuit.

Carpenter’s square

Pliers

Metal Snips

REMOVE THE PACKAGING

Remove the parts packages and packing materials.

Lift the hood out of the box.

IMPORTANT: Lift the hood by grasping the outside edges of the exhaust opening on the top.

 

Parts

Parts

Parts

 

Hood

 

Motor

 

Mounted

 

on Skid

Shipping Carton

Carefully, lay the hood on its side. A support frame is secured to the inside top of the hood. Remove the attachment screws at the outside top. Discard screws.

Grasp the support frame inside the hood with both

hands and carefully rotate out of the opening.

Be careful not to scratch the hood.

Place the hood on a protective surface to prevent scratches and damage to the stainless steel finish.

The hood motor is shipped secured to the skid with 4 screws. Locate and remove 2 screws on each side of the motor. Discard the shipping skid and screws.

8

Page 8
Image 8
GE ZV541 Installation Preparation, Tools And Materials Required, Remove The Packaging, Be careful not to scratch the hood