Installation Instructions
STEP 1 CONSTRUCT CEILING SUPPORT
Plan the Location of the Hood and Ductwork
•Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood.
Ceiling
Hood
Ducting
Centerline
Front
Align With | ||
Cooktop | ||
Center of | ||
Cooktop |
| |
| Countertop |
•The hood should extend beyond the front and rear edge of the cooking appliance.
•The duct in the ceiling must be centered over the cooktop.
Ceiling
Hood
Ducting
Centerline
Front
Align With | ||
Cooktop | ||
Center of | ||
Cooktop |
| |
| Countertop |
42" Hood Side View | 54" Hood Side View | ||||||
Ceiling Support Structure |
|
|
|
|
|
| |
• At the hood location, install 2 x 4 cross framing between | • Arrange cross framing in the ceiling to suit the existing | ||||||
ceiling joists as shown. (2x4’s are required to support the | structure. | ||||||
weight of the hood.) |
|
|
|
|
| • Your ceiling joists will be like one of the following | |
|
|
|
|
|
|
| examples. |
|
|
|
|
|
|
| |
|
|
|
|
| |||
|
|
| 17” (54” Hood) Install |
|
| ||
EXAMPLE A |
|
|
|
| |||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
|
|
|
| Symmetrically About |
|
|
|
|
|
|
|
| |||
|
|
|
| Duct/Cooktop Centerline |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8 5/8” |
|
|
|
| ||
16 | ” | Joist |
|
|
|
|
| 10” Duct |
| ||||
|
|
|
|
|
| ||||||||
Spacing |
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2x4 Cross
Framing
Front
of
Hood
Align ductCooktop to center of
Cooktop
Outline
Top View – Ceiling Joists Parallel to Front of Hood
10