GE ZV421, ZV541 Install Hood, Connect Duct, Install Duct Transition With Damper

Models: ZV421 ZV541

1 20
Download 20 pages 1.99 Kb
Page 15
Image 15
STEP 5 INSTALL DUCT TRANSITION WITH DAMPER

Installation Instructions

STEP 5 INSTALL DUCT TRANSITION WITH DAMPER

Bumper Pads

Duct

Transition

Attachment

Screws

Screws C

IMPORTANT: Remove shipping tape from damper and check that damper moves freely.

Place the transition piece over the hood exhaust and secure with 4 Screws C provided.

Use duct tape to seal the connection. Check to be sure the damper moves freely.

STEP 6 INSTALL HOOD

Note: THREE PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION!

1/4" Gap

Attachment

Keyholes

Back out the hanging screws on the bottom of the support frame to a 1/4" gap.

Lift the hood up to the support frame. Carefully align the hood keyhole to the screws on the support frame. Slide the hood to engage the keyhole slots.

Tighten the screws.

Install

2 Safety

Screws

Screws C

Install safety screws into the top of the hood as shown.

Check hood level in both directions.

STEP 7 CONNECT DUCT

Loosen duct collar and slide down to cover gap between transition and house duct.

Tighten collar

screws and tape all joints.

Seal all connections with duct tape.

Slide Duct

Collar Down

STEP 6 INSTALL HOOD to Cover Gap

Note: Do not drive screws through this duct connection. Doing so will prevent proper damper operation.

15

Page 15
Image 15
GE ZV421, ZV541 Install Hood, Connect Duct, Install Duct Transition With Damper, Slide Duct Collar Down to Cover Gap