GE ZV541, ZV421 Finalize Installation, Install Supplied Duct Cover And Top Cover

Models: ZV421 ZV541

1 20
Download 20 pages 1.99 Kb
Page 18
Image 18
STEP 13 INSTALL SUPPLIED DUCT COVER AND TOP COVER

Installation Instructions

STEP 13 INSTALL SUPPLIED DUCT COVER AND TOP COVER

STEP 14 FINALIZE INSTALLATION

Screws D

Install Duct

Cover Screw STEP 14 FINALIZE INSTALLATION on Each Side

Check all lamps to assure tightness in sockets.

Turn power on at the circuit breaker.

Refer to the Owner’s Manual for operating and cleaning instructions.

Install the supplied 2-piece duct cover over the support frame (if using supplied frame). Snap ends together.

Secure duct covers to support frame with 2 Screws D.

For a more finished appearance, a top cover is supplied and should be installed whenever the top of the hood is visible.

TIP: Place pieces

 

 

of tape over ends

 

 

of the cover to

 

 

prevent scratching

Tape

Tabs

the duct cover.

 

 

 

Remove tape

 

 

before installing

 

 

screws.

 

 

Engage tabs into slots on each side at the top of the hood. The covers should lay flat in the impression on top of the hood.

Top Cover

Screws C

Install Screws

 

Front and Back

Install 2 Screws C to secure the cover to the hood at the front and back.

18

Page 18
Image 18
GE ZV541, ZV421 Finalize Installation, Install Supplied Duct Cover And Top Cover, Installation Instructions