GE ZV541 Install Accessory Or Supplied Support And Duct Covers, Secure house wiring, Prudence

Models: ZV421 ZV541

1 20
Download 20 pages 1.99 Kb
Page 14
Image 14
STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COVERS

Installation Instructions

STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COVERS

 

Install

Adjust

 

Frame to

Safety Screw

nstallation

on Each Side

Height

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Install Small Pan Head

Screws on Each Side

Top Duct

Cover

Screws D

Bottom Duct

Cover

Install Stop

Screw

Screws E

Stop Screw

Storage Location

Install supplied support frame OR telescoping accessory frame

Hang the supplied support frame or telescoping accessory frame to the ceiling joists and cross framing on the 4 hex head screws by engaging the keyhole slots on the frame.

Check to be sure the support frame is level, vertically and horizontally.

Tighten the hex head screws securely.

Install safety screws, (Screws E) on each side of the frame.

Adjust telescoping accessory frame to length

Remove the 8 frame adjustment screws. Adjust the lower support up or down to the pre-determined length. Reinstall and securely tighten the 8 adjustment screws.

Slide the top (inner) accessory duct cover up and over the frame. Secure the duct cover to the frame as shown using Screws D.

Locate and remove the safety stop screw. Slide bottom duct cover up and over the top duct cover. Align bottom duct screw hole to the hole in the frame. Hold the duct cover in place while installing screw.

Adjust telescoping accessory frame to length CAUTION: The stop screw must be installed. Failure to do so could result in personal injury or damage to the duct cover. The stop screw will prevent the lower duct from sliding down while completing the installation.

Secure house wiring PRUDENCE

Il faut mettre en place la vis de butée afin d’éviter des blessures ou d’endommager l’enceinte du conduit. La vis de butée empêche l’enceinte inférieure du conduit de descendre pendant l’installation.

Secure house wiring

Route house wiring through the ceiling and pull a length to reach the hood junction box, approximately 6” below the support. Tape to the right side of the support frame.

IMPORTANT: Again, check to be sure the support is level in both directions. There is no way to level the hood after the hood is secured to the frame.

14

Page 14
Image 14
GE ZV541 Install Accessory Or Supplied Support And Duct Covers, Adjust telescoping accessory frame to length, Prudence