DIAGNOSTIC TESTS

SHORT TO GROUND:

Set VOM to measure resistance. Disconnect Wire 14A from the LPG Fuel Solenoid. Connect one meter test lead to LPG Fuel Solenoid. terminal that Wire 14A was just removed from. Connect the other meter test lead to a clean frame ground. LPG Fuel Solenoid. coil resistance of approximately 30-32 ohms Should be measured. Current draw of the LPG Fuel Solenoid at nominal voltage Is approximately 380 milliamps or 0.380 amps.

RESULTS:

1. If the solenoid energized in Step 1, proceed to Test 32.

2. If “Continuity” was not measured in Step 2 repair or replace Wire 0 between the LPG Fuel Solenoid (FS) and the Ground Terminal (GT) in the control panel.

3.If “Continuity” was measured in Step 2, repair or replace the Fuel Solenoid (FS).