43. Wrap the High Cable (81) under a Small Pulley | 43 |
| |
(74). Attach the Cable, a Small Cable Trap (93), |
| ||
|
| ||
and two Half Pulley Guards (91) to the second |
|
| |
hole from the top of the |
|
| |
M10 x 48mm Bolt (125) and an M10 Nylon |
|
| |
Locknut (153). Make sure that the Cable Trap |
|
| |
and the Half Pulley Guards are oriented as |
|
| |
shown. |
|
| |
|
| 81 | |
|
| 74 | |
| 93 | 153 | |
|
| ||
| 91 | 91 | |
| 125 | 158 | |
44. Wrap the High Cable (81) over a Small Pulley | 44 | 18 | |
(74). Attach the Small Pulley, a Small Cable Trap | |||
| |||
(93), and two Half Pulley Guards (91) to the indi- | 153 |
| |
cated bracket on the Weight Carriage Frame (18) | 91 | 74 | |
with an M10 x 48mm Bolt (125) and an M10 |
| 93 | |
Nylon Locknut (153). Make sure that the Cable |
| 91 | |
Trap and the Half Pulley Guards are oriented |
| 81 | |
as shown. |
| ||
| 125 | ||
|
|
23