Goodman Mfg MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9 Horizontal Upflow Model, Horizontal Counterflow

Models: GAS-FIRED WARM AIR FURNACE MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9

1 56
Download 56 pages 37.33 Kb
Page 30
Image 30
HORIZONTAL [UPFLOW MODEL]

 

MANUAL SHUT-OFF VALVE

 

(UPSTREAM FROM GROUND

 

JOINT PIPE UNION)

GROUND

ALTERNATE

UNION

JOINT

LOCATION

PIPE

DRIP LEG

UNION

 

GAS VALVE

GROMMET IN STANDARD

GAS LINE HOLE

 

BURNERS

DRAIN TRAP

 

 

 

 

GROMMET IN ALTERNATE

 

 

 

 

MANIFOLD

 

 

 

 

 

 

GAS LINE HOLE

ALTERNATE GAS

 

 

 

 

 

LINE LOCATION

 

 

 

HORIZONTAL [UPFLOW MODEL]

 

ALTERNATE

GROUND

UNION

LOCATION

JOINT

 

PIPE

 

UNION

 

GAS VALVE

 

BURNERS

DRAIN TRAP

MANIFOLD

GORMMET IN ALTERNATE

ALTERNATE GAS

GAS LINE HOLE

LINE LOCATION

 

HORIZONTAL [COUNTERFLOW]

Gas Piping Connections

HORIZONTAL [COUNTERFLOW]WARNING

EDGES OF SHEET METAL HOLES MAY BE SHARP. USE GLOVES AS A PRECAUTION WHEN REMOVING HOLE PLUGS.

DIRECT/STANDARD INLET PIPING

When gas piping enters directly to the gas valve through the standard inlet hole, the installer must supply straight pipe with a ground joint union to reach the exterior of the furnace. The rigid pipe must be long enough to reach the outside of the cabinet to seal the grommet cabi- net penetration. A semi-rigid connector to the gas piping can be used outside the cabinet per local codes.

INDIRECT/ALTERNATE INLET PIPING

When gas piping enters indirectly to the gas valve through the alternate gas inlet hole, the following 1/2 inch pipe fittings (starting from the gas valve) to reach the outside of the cabinet must be supplied:

(1) Close nipple

(1) 90 degree street elbow

(1) 2 1/2” pipe nipple

(1) 90 degree elbow

Straight Pipe

The straight pipe must be long enough to reach the outside of the cabinet so as to seal the grommet cabinet penetration and to install the ground joint union outside the cabinet. A semi-rigid connector to the gas piping can be used outside the cabinet per local codes.

GAS PIPING CHECKS

Before placing unit in operation, leak test the unit and gas connec- tions.

Gas Piping ConnectionsWARNING

TO AVOID THE POSSIBILITY OF EXPLOSION OR FIRE, NEVER USE A MATCH OR OPEN FLAME TO TEST FOR LEAKS.

Check for leaks using an approved chloride-free soap and water solution, an electronic combustible gas detector, or other approved testing methods.

NOTE: Never exceed specified pressures for testing. Higher pressure may damage the gas valve and cause subsequent overfiring, resulting in heat exchanger failure.

Disconnect this unit and shutoff valve from the gas supply piping system before pressure testing the supply piping system with pres- sures in excess of 1/2 psig (3.48 kPa).

Isolate this unit from the gas supply piping system by closing its external manual gas shutoff valve before pressure testing supply piping system with test pressures equal to or less than 1/2 psig (3.48 kPa).

30

Page 30
Image 30
Goodman Mfg MH95/ACSH96/AMEH96/ GCH95/GME95/GCH9 Horizontal Upflow Model, Horizontal Counterflow, Gas Piping Connections