UPRIGHT INSTALLATIONS-TRAP ON LEFT SIDE
NOTE: For left side trap installation, grommets must be moved to the left side of the furnace and the plugs installed on the right side of the furnace.
1.Remove the rubber plug from the left side drain port on the front cover.
2.Secure Hose A to front cover drain port with a red hose clamp. Route hose to rear side panel grommet hole.
3.Cut and remove 1/4 inch from the end of the drain port on the rubber elbow.
4.Insert Tube 1 into rubber elbow drain port and secure with silver hose clamp. Angle tube outward toward front of furnace.
5.Cut “X” inches from the long end of Hose B and discard. Refer to table for appropriate length to cut. Secure remaining hose to Tube 1 with a green hose clamp. Route other end of Hose B to front left side panel grommet hole.
NOTE: Long hose “B” must always be connected to Tube 1 and the elbow and not on the front cover.
6.Insert short end of each Tube 2 through side panel grommet holes. Secure tubes to Hose A and Hose B with green hose clamps. Ensure hoses and tubes maintain a downward slope for proper drainage and that they are not kinked or binding.
LEFT
SIDE PANEL
FRONT COVER
DRAIN PORT
RED HOSE
CLAMP
HOSE A
SIDE PANEL
DRAIN
HOLES
TUBE(S) 2
DRAIN
TRAP
| RUBBER |
| ELBOW |
| RUBBER |
| ELBOW |
| DRAIN PORT |
| SILVER HOSE |
| CLAMP |
| TUBE 1 |
| GREEN HOSE |
| CLAMP |
GREEN | HOSE B |
| |
HOSE CLAMP |
|
Upright “Standard” Connections - Left Side | |
(Upflow Shown, Counterflow Similar) |
23