Shutdown & Cleaning - After Direct Immersion Method Applications
Shutdown & Cleaning - After Direct Immersion Method Applications
Pail Flushing
• For short term shutdown periods (over- night to one week) refer to Short Term Storage, page 29.
•For flushing after spraying
•For flushing after spraying
•If you are using
5.Place waste and paint pail side by side.
ti9726a
6.Submerge suction tube in water or flushing solvent.
ti9827a
7.Place prime tube in waste pail.
1.Relieve pressure, page 7.
ti9825a
2.If you used a spray gun, remove tip and guard assembly from gun and place in flushing fluid.
If you used a roller, leave roller assembly attached to gun.
3.Lift suction tube and prime tube from paint pail. Let them drain into paint for a while.
4. Separate prime tube (smaller) from suction tube (larger).
TIA
8.Set AllControl to
PRIME/CLEAN PUMP.
ti9169a
9.Flush until approximately 1/3 of the flushing fluid is emptied from the pail.
10.Turn AllControl to OFF.
11.
a. If you used a spray |
|
gun only, continue | ti9168a |
Pail Flushing, Step 12. |
|
b.If you used a roller follow Cleaning Roller instructions beginning on page 28.
24 | 312079A |