![](/images/backgrounds/198971/bg9.png)
Operation
Operation Operation
Operation
Checklist Checklist
ChecklistBefore Before
BeforeStarting Starting
Starting
•Checkthecompressedairsupplyaccordingtoits
operatormanual.Makesuretheairbeingsupplied
iscleanandrelativelyfreeofmoistureandoil
topreventwatercontaminationoftheaircontrol
components.
•Makesureairdeliveryvalvesareclosedbeforethe
airsupplycompressorisstarted.
•Makesureallrequiredhoserestraintsandcoupler
pinsareinworkingconditionandproperlyinstalled.
•Makesuretheequipmentissituatedonlevel
ground.Failuretokeeptheunitonlevelground
willmakeitdifcultorimpossibletopurgeallofthe
airfromthepressurevessel.
•Makesuretheequipmentisproperlysupportedon
asurfacethatcanholditstotalweight.Theweight
ofallpersonnel,thematerialbeingblasted,and
anyabrasivebeingstoredmustalsobeconsidered
(seeTechnicalSpecications,page45).
•Makesurethewatertankwillremainfullysupplied
withcleanwatertoavoidanypossibilityofthe
pumprunningdryduringblasting.
•Makesurethatthepotiscleanandfreeofany
internaldebris.
•Makesuretousethecorrecttypeofblastcontrol.
Blastingwith150feet(45m)ormoreofblasthose
requirestheuseofanelectricblastcontrol.An
electricblastcontrolcanalsobeusedonhose
lengthsbelow150feet(45m).
•Makesuretheblasthoseislaidoutasstraightas
possiblebetweentheequipmentandtheworksite
(acoiledblasthosewilluncoilunderpressure).
NOTICE NOTICE
NOTICE
Sharpbendsintheblasthosecouldcausethe
abrasivetowearthroughthehoseandcause
prematurefailureofthehose.
•Makesuretherubbergasketineachhosecoupler
isinworkingcondition.
334667B 9