Spindle Break-In
Before placing operationql loads on the spindle, complete this
Failure to complete the spindle
To perform the spindle
1.Make sure the spindle is completely stopped, then set spindle speed to 90 RPM (refer to Page 26 for detailed instructions).
Do not leave the mill/drill unattended during the Spindle
2.run machine for a minimum of 10 minutes.
3.repeat Step 2 for each spindle speed, work- ing to progressively higher speeds.
Note: If the machine is new, we recommend changing the headstock oil while it is still warm and any particles from the manufacturing process are still in suspension (refer to Page 31 in the Lubrication subsection for detailed instructions).
The spindle
Inspections &
Adjustments
The following list of adjustments were performed at the factory before the machine was shipped:
• | gib Adjustments | Page 37 |
• | Leadscrew Backlash |
|
| Adjustments | Page 37 |
• | Return Spring Tension | Page 40 |
Be aware that machine components can shift during the shipping process. Pay careful atten- tion to these adjustments during operation of the machine. If you find that the adjustments are not set according to the procedures in this manual or your personal preferences,
Model G0755 (Mfg. Since 1/13)