Start Up Rinsing Procedure (con’t)
5.After the
7. Plug in the control valve. (See Figure 15.)
Figure 13
Once water begins to flow into the tank fill the brine tank with a minimum of 100 lbs of salt pellets.
6.After the
Figure 14
Figure 15
8.If it is necessary to extend the length of the transformer cord, an optional 15 foot
a.Strip insulation from wire 5/16 inch (7.87 mm) from wire end.
b.Insert stripped wire into barrel of connector and crimp. For best results, crimp twice per wire as shown in Figure 17 .
Neither splice connections nor extension wire are supplied. They are available at hardware or electrical stores.
Figure 16
Figure 17
Hamilton Beach Owner’s Manual 11