NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 26. Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).

 

NAILS (4 REQUIRED)

 

RAFTER

CEILING

 

 

CEILING FIRESTOP

Figure 27.

Attic Firestop

C. Vent Termination

Refer to Cinch Pipe and Termination Cap installation in- structions.

Horizontal Termination

The termination kit should pass through the wall firestops from the exterior of the building.

Adjust the termination cap to its final exterior position on the building and interlock the flue sections.

WARNING: THE TERMINATION CAP MUST BE

!POSITIONED SO THAT THE ARROW IS POINT- ING UP.

!WARNING: VENTING TERMINALS SHALL NOT BE RECESSED INTO A WALL OR SID-

ING. VENT TERMINATION CLEARANCES MUST BE FOLLOWED TO AVOID FIRE DANGER. SEE VENT TERMINATION MINIMUM CLEARANCES DI- AGRAM ON FOLLOWING PAGE.

7 1/4”

(184mm)

Figure 28. Trapezoid Termination Cap

24

Hearth & Home Technologies • 6000BE, 6000BE-IPI2024-900 Rev. G • 11/05

Page 24
Image 24
Hearth and Home Technologies 6000BE owner manual Vent Termination, Attic Firestop, Horizontal Termination