10" (254mm)

10” (254mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

MEMBERS

 

CEILING

 

FIGURE 1.23 Hole and New Framing Members

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

FIGURE 1.24 Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NAILS (4 REQUIRED)

RAFTER

CEILING

CEILING FIRESTOP

FIGURE 1.25 Attic Firestop

C. Flue Termination

For Horizontal Terminations - To attach and secure the termination to the last section of horizontal flue:

The rear flue heat shield MUST be placed one inch above the top of the flue between the wall shield and the base of the termination cap.

One section of the heat shield is attached to the wall shield. The other is attached to the termination cap in the same manner.

The heat shield sections will overlap to match the wall thickness (depth).

If the wall thickness does not allow the required 1-1/2 inch heat shield overlap, an extended heat shield must be used. The extended heat shield will need to be cut to the thickness of the wall and be attached to the wall shield.

The small leg in the shield rests on top of the flue to properly space it from the pipe section (see Figure 1.26).

Interior

Rear Vent

Wall Shield

Heat Shield

 

38mm min.

 

overlap

Outer Flue

 

Inner Flue

38mm min.

 

 

Overlap

INTERIOR

EXTERIOR

 

FIGURE 1.26 Flueing through the Wall

The termination kit should pass through the wall firestops from the exterior of the building.