Heat & Glo LifeStyle 6000TRS-CD manual Alcove Applications, = Vent Terminal, X = Air Supply Inlet

Models: 6000TRS-CD

1 42
Download 42 pages 3.32 Kb
Page 28
Image 28
= VENT TERMINAL

D

 

v

E

 

L

B

X = AIR SUPPLY INLET= AREA WHERE TERMINAL IS NOT PERMITTED v

A

G Alcove Applications

R

H

M

N

P

Q

(See Note 2)

V

v

B

v

 

 

F v

v

B

 

v

A

91.4 cm

I

M

v X

 

 

J or K

T

V

S

Electrical

S

V

 

Service

 

 

 

 

 

 

 

 

 

 

D

V

V

= VENT TERMINAL

X = AIR SUPPLY INLET

= AREA WHERE TERMINAL IS NOT PERMITTED

A

=

30.5 cm

clearances above grade, veran-

L

=

2.1 M

clearance above paved side-

 

 

(See Note 1)

da, porch, deck or balcony

 

 

 

 

 

(See Note 1)

 

walk or a paved driveway lo-

B

=

30.5 cm

clearances to window or door

 

 

 

 

 

 

 

cated on public property

M*

=

50.8 cm

 

clearance under veranda, porch,

 

 

 

that may be opened, or to per-

 

 

 

 

 

 

 

 

 

 

deck, balcony or overhang

 

 

 

manently closed window.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

118.9 cm

 

vinyl

 

 

 

 

 

(Glass)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

=

50.8 cm

vertical clearance to unventilat-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alcove Applications

 

 

 

 

 

ed soffit or to ventilated soffit lo-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

cated above the terminal

 

 

N

 

=

15.3 cm

non-vinyl sidewalls

 

=

84.8 cm

for vinyl clad soffits and below

 

 

 

 

 

 

 

 

 

30.5 cm

vinyl sidewalls

 

 

 

electrical service

 

 

P

 

=

2.4 M

 

 

 

 

 

F

=

22.9 cm

clearance to outside corner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QMIN

 

RMAX

 

G

=

15.3 cm

clearance to inside corner

 

 

 

 

 

 

 

 

 

 

 

1 cap

91.4 cm

 

2 x Q ACTUAL

 

H

=

91.4 cm

not to be installed above a gas

 

 

______________________________________________________________________

 

 

 

 

2 caps

1.8 M

1 x Q ACTUAL

 

 

 

 

meter/regulator assembly within

 

 

 

 

 

 

 

 

 

 

3 caps

2.7 M

2/3 x Q ACTUAL

 

 

 

 

91.4 cm horizontally from the cen-

 

 

 

 

 

 

 

 

 

______________________________________________________________________

 

 

 

 

ter-line of the regulator

 

 

 

4 caps

3.7 M

1/2 x Q ACTUAL

 

I

=

91.4 cm

clearance to gas service regu-

 

 

 

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

 

 

 

 

lator vent outlet

 

 

 

 

 

 

 

 

 

 

 

J

=

22.9 cm

clearance to non-mechanical air

 

S

=

15.3 cm

 

clearance from sides of

 

 

 

supply inlet to building or the

 

 

 

 

 

 

 

 

 

(See Note 5)

electrical service

 

 

 

combustion air inlet to any other

 

 

 

 

 

 

 

 

 

T

=

30.5 cm

 

clearance above electrical

 

 

 

appliance

 

K

=

91.4 cm

clearance to a mechanical (pow-

 

 

 

 

 

(See Note 5)

service

 

 

ered) air supply inlet

*only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

NOTE 1: On private property where termination is less than 2.1 M above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested. (See vents components page)

NOTE 2: Termination in an alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be 91.4 cm minimum between termination caps. 2. All mechanical air intakes within 3.0 M of a termination cap must be a minimum of 91.4 cm below the termination cap. 3. All gravity air intakes within 91.4 cm of a termination cap must be a minimum of 30.5 cm below the termination cap.

Figure 25 Vent Termination Minimum Clearances

NOTE 3: Local codes or regulations may require different clearances.

NOTE 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

NOTE 5: Location of the vent termination must not interfere with access to the electrical service.

NOTE: Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, over- hang and ground clearances as stated in the instructions.

Heat & Glo assumes no responsibility for the improper perfor- mance of the appliance when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.

28

Page 28
Image 28
Heat & Glo LifeStyle 6000TRS-CD manual Alcove Applications, = Vent Terminal, X = Air Supply Inlet