Heat & Glo LifeStyle 6000TRS-CD Make the outline of the roof hole around the centerpoint nail

Models: 6000TRS-CD

1 42
Download 42 pages 3.32 Kb
Page 26
Image 26
•Make the outline of the roof hole around the centerpoint nail.

26

FIGURE 23 DVP Termination Cap

For Vertical Terminations - To locate the flue and install the flue sections:

Locate and mark the flue centerpoint on the underside of the roof, and drive a nail through the centerpoint.

Make the outline of the roof hole around the centerpoint nail.

The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 2.5cm clearance from the vertical flue pipe to combustible materials.

Mark the roof hole accordingly.

Cover the opening of the installed flue pipes.

Cut and frame the roof hole.

Use framing lumber the same size as the roof rafters and install the frame securely. Flashing anchored to the frame must withstand heavy winds.

Continue to install concentric flue sections up through the roof hole and up past the roof line until you reach the appropriate distance above the roof.

CAUTION: FOLLOW THE REQUIREMENTS OF THE AGA GAS INSTALLATION CODE FOR MINIMUM HEIGHT REQUIREMENTS ABOVE THE ROOF.

To seal the roof hole, and to divert rain and snow from the flue system:

Attach a flashing to the roof using nails, and use a non- hardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the flue pipe and snap into place.

Page 26
Image 26
Heat & Glo LifeStyle 6000TRS-CD manual Make the outline of the roof hole around the centerpoint nail