2-way, 3-way Valve

(1) Pumping down

Indoor unit

Liquid side

 

Close

Outdoor unit

2-Way

valve

Gas side

Open

3-Way

valve

Indoor unit

Liquid side

 

Close

2-Way

valve

Gas side

Open

3-Way

valve

manifold gauge

Low- handle

(CLOSE)Hi- handle (CLOSE)

Procedure

1.Confirm that both the gas side and liquid side valves are set to the open position.

-Remove the valve stem caps and confirm that the valve stems are in the raised position.

-Be sure to use a hexagonal wrench to operate the valve stems.

2.Operate the unit for 10 to 15 minutes.

3.Stop operation and wait for 3 minutes, then connect the manifold gauge to the service port of the gas side valve.

-Connect the hose of the gauge with the push pin to the service port.

4.Air purging of the charge hose.

-Open the Low-handle valve on the gauge slightly to air purge from the hose.

5.Set the liquid side valve to the closed position.

6.Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 1kgf/cm2(14.22psi).

7.Immediately set the gas side valve to the closed position.

-Do this quickly so that the gauge ends up indicat- ing 1kg/(14.22psi).

8.Disconnect the charge set, and replace the liquid side and gas side valve caps and the service port nut.

-Use torque wrench to tighten the service port nut to a torque as indicated below.

Outside diameter

 

Turque

mm

inch

kg.m

 

lbf.in

Ø6.35

1/4

1.8

 

156.2

Ø9.52

3/8

4.2

 

364.5

Ø12.7

1/2

5.5

 

477.4

- Be sure to check for gas leakage.

• Be sure not to short the pressure switch S/W, otherwise if the low pressure switch S/W detects low pressure it will stop the compressor.

- 77 -

Service Manual

Page 77
Image 77
Heat Controller A-MMC24FA-1, B-MMH12FA-1, B-MMC12FA-1, B-MMC09FA-1, B-MMH09FA-1, A-MMH24FA-1 manual Pumping down, Procedure