2-way, 3-way Valve

(2) Evacuation

(All the refrigerant leaked)

Indoor unit

Liquid side

 

Open

Outdoor unit

2-Way

valve

Gas side

Open

3-Way

valve

Indoor unit

Liquid side

 

Open

2-Way

valve

Gas side

Open

3-Way

valve

manifold gauge

Vacuum pump

Low- handle

(OPEN)Hi- handle (OPEN)

• Procedure

1.Confirm that both the liguid side valve and gas side valve are set to the opened position.

2.Connect the vaccum pump to the center hose of the manifold gauge.

3.Connect the service port of the gas side valve to the low side of the gauge.

4.Evacuate for approximately one hour.

-Confirm that the gauge needle has moved toward-76 cmHg (vacuum of 4 mmHg or less).

5.Close the Low handle of the gauge, turn off the vacuum pump and confirm that the gauge needle does not move(approximately 5 minutes after turning off the vacuum pump).

6.Disconnect the charge hose from the vacuum pump.

-If the vacuum pump oil becomes dirty or deplet- ed, replenish as needed.

7.Replace the valve and service port caps.

Wall Mounted Multi-Zone Split System Air Conditioner

- 78 -

Page 78
Image 78
Heat Controller A-MMC18FA-1, B-MMH12FA-1 Evacuation, All the refrigerant leaked, Replace the valve and service port caps