Hitachi SJ-FB manual Setting Flowchart for the DIP Switches, Switch setting flowchart

Models: SJ-FB

1 35
Download 35 pages 35.18 Kb
Page 20
Image 20

Chapter 5 SETTING

5.4Setting Flowchart for the DIP Switches

START

Detect a wire break of

NO

A, B phase signal?

 

YES

Set SWENC1

switch ON.

Set SWENC1

switch OFF.

Detect a wire break of the

NO

Z phase signal?

 

YES

Set SWENC2

Set SWENC2switch OFF. switch ON.

Use the pulse train position command input?

YES

Connect parallel motors to the pulse train position command input?

YES

Turn SWR1, 2 on only 1 unit that is the most distant from a master inverter in a plural motor.

NO

NO

Set SWR1,2

switch ON.

END

Figure 5-3 Switch setting flowchart

20

Page 20
Image 20
Hitachi SJ-FB manual Setting Flowchart for the DIP Switches, Switch setting flowchart