Chapter 4 WIRING AND CONNECTION

(Note 3) : Be sure to separate the power wiring from the control circuit wiring. If they have to be crossed, be sure that they cross at a right angle.

Power cables

R, S, T, U, V, W, P, PD,

 

RB, N, R0, T0 etc.

Right angle

 

Input/Output signal lines

Control signals (STAT, ORT, LAC, PCLR, SAP, SAN, SBP, SBN,

EAP, EAN, EBP, EBN, POK, DSE, ZS, AP, AN, BP, BN, L, EP5,

EG5, CM1, CM2, P24, PLC etc.)

Separate 10cm or more.

(Note 4) : Take care not to short circuit between the EP5 and EG5 terminals. There is a danger of malfunction.

(Note 5) : Isolate common signal for inverter analog signals (L terminal of the logic card of SJ300) from common terminal of the SJ-FB.

(Note 6) : Be sure to connect the encoder signal lines properly so that the relationship among their phases is as shown below during rotation of the motor (Standard EG5).

EAP

EAN

EBP

EBN

EZP

EZN

15

Page 15
Image 15
Hitachi SJ-FB manual Eap Ean Ebp Ebn Ezp Ezn