ASSEMBLY STEP 1

 

 

 

 

HARDWARE BAG 1 CONTENTS :

 

A

Cut the yellow banding straps and lift the

 

 

 

 

running deck upward to remove all contents

BOLT (A)

SPRING WASHER (B)

ARC WASHER (C)

 

from underneath the running deck.

20 mm

8.2 mm

8.2 mm

B

Open hardware bag 1.

Qty: 6

Qty: 6

Qty: 6

 

 

 

C

Slide main frame boot up console

 

LEAD WIRE

 

 

mast. Place right console mast over

 

 

 

main frame bracket.

 

 

 

 

 

 

 

D

Pull lead wire through right console

 

 

 

 

mast. After pulling the lead wire through

 

 

 

 

the mast, the top of the console cable

 

 

 

 

should be located at the top of the mast. Detach

 

 

 

 

and discard lead wire.

CONSOLE MAST

 

 

 

Note: Do not pinch console cable when

MAIN

 

 

 

placing the mast onto the main frame

 

 

 

bracket.

FRAME

 

 

 

BOOT

CONSOLE CABLE

 

 

 

 

 

E

Attach console mast to main frame

BOLTS (A)

 

 

 

bracket using 3 bolts (a), 3 spring

SPRING

 

 

 

washers (b) and 3 arc washers (c).

 

 

 

 

WASHERS (B)

 

 

F

Slide main frame boot down over main

ARC WASHERS (C)

 

 

 

 

 

frame bracket.

 

 

 

 

MAIN FRAME BRACKET

 

G

Repeat steps D–F on other side.

10

 

 

 

 

Page 10
Image 10
Horizon Fitness CT12.1 owner manual Assembly Step, Pull lead wire through right console